bowers stadium expansion
In February 2007, the Bowers Museum expanded again, adding the $14.6-million Dorothy and Donald Kennedy Wing, named for Donald P. Kennedy, an executive of the First American Corporation, and his wife. Im 42 years old God willing, I have another 20 years. (32) The rendering by firm AECOM shows the 120-yard field (100 yards plus two ten-yard end zones). Whether the idea costs $250 million or more, fundraising will be the key piece. We asked Dickey if this vision is similar to the vision of Gene Bleymaier to replace a green field at Bronco Stadium with blue a decision that has come to define not only the stadium but the school, and even in part Boise and Idaho as a whole. Reviewed on Feb 7, 2023. We asked Dickey if this vision is similar to the vision of Gene Bleymaier to replace a green field at Bronco Stadium with blue a decision that has come to define not only the stadium but the school, and even in part Boise and Idaho as a whole. An entirely new building would go up in the area where the historic Bronco Gym now stands. The seating area would be ringed by a concourse that would wrap around the arena. We wont fail due to a lack of effort. With the growth of the Treasure Valley and launching a 10,000 member drive, thats specific to building our pipeline. The main concourse would see long-hoped-for new amenities, including new bathrooms, upgraded concessions, and more. This includes the Bronco Gymnasium, which opened in 1956, the current gymnastics training facility, and the natatorium. (The plan) is to show that if we would build this type of facility with this many square feet, wed have to see what that ultimate cost would be, Dickey said. In general, returning to a theme he reiterated through the interview, items may change, shift and adjust depending on a host of factors, including cost, need, community feedback, and permitting. The number of sports arenas on campus would double under the plan. The school previously announced this element in 2020 but so far has not moved forward on the initial concept.A replacement for the Varsity Center the facility that sits at the south end of the stadium and houses various offices for athletics, locker rooms, and more.Upgrades to the existing basketball and concert arena currently known as ExtraMile Arena and the adjacent Arguinchona Basketball Complex. Winds S at 10 to 15 mph.. 3.9/5 Very Good! Pearlman believes Kaplan. A new premium entry and event club on the north side of the building.Premium seating in the existing mezzanine (orange seats) area of the arenas north side.New sideline club and loge boxes.New offices and weight room specific to basketball on the west side of the building. (29)A new outdoor soccer field. As noted above, the four-story building would be notched in the south end zone, and some offices would feature views over the blue turf. It's up in the. Via AECOM Texas Tech allocated a total of $19 million to the . Dickey said the process to build outward-facing roles that engage with ticket-buyers, donors, and others has been the first step. (29). "Tolerance implies no lack of commitment to one's own beliefs. window.zone_load_1913464592 = function(z, d) { if (!d.count) document.getElementById('zone_load_1913464592').style.display = 'none'; }; Renderings show a terraced seating area, grandstands, a press box facility, and smaller jumbotron. New Varsity Center, football complex upgrades South end zone Albertsons Stadium Thats my goal every day when I come into this office. Were going to continue to put our best foot forward and create the fan experience thats owed to this community. This includes the Bronco Gymnasium, which opened in 1956, the current gymnastics training facility, and the natatorium. Some of the ideas align with the 2019 plan, but the concept does not show some ideas like an academic center which could move to the new Varsity Center. Yeah jamming all that stuff together probably wasn't a great option, but may be the only one they had. The larger, flashier portion of the plan is significantly more extensive. window.zone_load_780287713 = function(z, d) { if (!d.count) document.getElementById('zone_load_780287713').style.display = 'none'; }; The larger weight room would connect directly to the court. At least one program, Bronco Spirit the cheerleaders and dance team is assumed to be located off-site. A training facility, ticketing office, visiting team locker room, concessions and restrooms are also envisioned. Dickey said the process to build outward-facing roles that engage with ticket-buyers, donors, and others has been the first step. It also contemplates new space for its joint venture with Learfield IMG College, upgrades to facilities graphic design, HR, IT, the Bronco Athletic Association, and more. per night. Weve spent the past year funding that and building it up. New Bronco Arena & tennis Thats not the intent. North end zone window.zone_load_344450169 = function(z, d) { if (!d.count) document.getElementById('zone_load_344450169').style.display = 'none'; }; window.zone_load_1974890726 = function(z, d) { if (!d.count) document.getElementById('zone_load_1974890726').style.display = 'none'; }; It also contemplates new space for its joint venture with Learfield IMG College, upgrades to facilities graphic design, HR, IT, the Bronco Athletic Association, and more. He called athletics the schools front porch and said he wants to improve the stadiums entryway both literally and virtually. The building now houses offices for athletics administration, various sports, weight rooms, and locker facilities. However, the school could potentially build a non-standard length field, Dickey said.Upgrades the football office complex on the north end of the stadium. He called athletics the schools front porch and said he wants to improve the stadiums entryway both literally and virtually. window.zone_load_1301423377 = function(z, d) { if (!d.count) document.getElementById('zone_load_1301423377').style.display = 'none'; }; Via AECOM Rendering inside Albertsons Stadium from the SE corner looking north. The last year has been about creating the infrastructure and the vision and having the plan to move us forward and best position us for success for the future. window.zone_load_1913464592 = function(z, d) { if (!d.count) document.getElementById('zone_load_1913464592').style.display = 'none'; }; The building now houses offices for athletics administration, various sports, weight rooms, and locker facilities. I want to do whats in the best interest of Bronco Nation. (28) The facility could be used for several sports, including gymnastics, basketball, and others. window.zone_load_1301423377 = function(z, d) { if (!d.count) document.getElementById('zone_load_1301423377').style.display = 'none'; }; New ideas, like a sideline club with blue carpeting at field level, are listed as revenue generation, as well as additional loge seating boxes for four. I want to do something epic for this community and this state. I want to do whats in the best interest of Bronco Nation. I want to be the best I can for the people I represent and lead. New Varsity Center, football complex upgrades A move to FBS for Sam Houston at this point is a reach for the program, with major hurdles to jump over. 7,284 is 58% of Elliott T. Bowers Stadium capacity on average, per year. New Bronco Arena & tennis New Varsity Center, football complex upgrades For this concept to come to fruition, some existing buildings and facilities would be torn down. In addition, the new Varsity Center concept (detailed below) would sit immediately behind the stands and video board, with windows looking out onto the stadium. It also contemplates new space for its joint venture with Learfield IMG College, upgrades to facilities graphic design, HR, IT, the Bronco Athletic Association, and more. It can make or break your season. The Bronco Arena would seat about 5,000 people roughly the same as ICCU Arena in Downtown Boise. A new premium entry and event club on the north side of the building.Premium seating in the existing mezzanine (orange seats) area of the arenas north side.New sideline club and loge boxes.New offices and weight room specific to basketball on the west side of the building. Will it happen? ' Next to that, a new practice gym for gymnastics would add updated, permanent space for the team. A new premium entry and event club on the north side of the building.Premium seating in the existing mezzanine (orange seats) area of the arenas north side.New sideline club and loge boxes.New offices and weight room specific to basketball on the west side of the building. In addition, the new Varsity Center concept (detailed below) would sit immediately behind the stands and video board, with windows looking out onto the stadium. When Steve Kaplan and Jason Levien led an American consortium's takeover of the club in 2016, they highlighted expanding the Liberty Stadium as one of their priorities. I dont want people to think this is my legacy. He called athletics the schools front porch and said he wants to improve the stadiums entryway both literally and virtually. It doesn't work that way. We asked Dickey if this vision is similar to the vision of Gene Bleymaier to replace a green field at Bronco Stadium with blue a decision that has come to define not only the stadium but the school, and even in part Boise and Idaho as a whole. window.zone_load_999052604 = function(z, d) { if (!d.count) document.getElementById('zone_load_999052604').style.display = 'none'; }; The seating area would be ringed by a concourse that would wrap around the arena. The last year has been about creating the infrastructure and the vision and having the plan to move us forward and best position us for success for the future. I dont know if it was a promised facility that came to fruition. Thats my goal every day when I come into this office. The dollars Via AECOM window.zone_load_1493316846 = function(z, d) { if (!d.count) document.getElementById('zone_load_1493316846').style.display = 'none'; }; per night. Theres a lot that goes into that. He called athletics the schools front porch and said he wants to improve the stadiums entryway both literally and virtually. display: table; Your legacy is there is some control I have but thats more determined by others. For this concept to come to fruition, some existing buildings and facilities would be torn down. There have been other leaders and presidents with ideas over the years. For this concept to come to fruition, some existing buildings and facilities would be torn down. It would feature a six-court indoor tennis facility near the existing outdoor Appleton Tennis Center. I came here because of potatoes and blue turf, and thats what I knew of that place. Some of the ideas align with the 2019 plan, but the concept does not show some ideas like an academic center which could move to the new Varsity Center. I came here because of potatoes and blue turf, and thats what I knew of that place. Theres not much I can control whether its conference realignment we can control what we can. Theres not much I can control whether its conference realignment we can control what we can. On August 7, 2008, the Texas Tech Board of Regents announced a $25 million expansion project. South end zone I want to represent this place and leave it better than I found it. Last year, BoiseDev told you about work to reimagine the facilities at ExtraMile Arena. The school previously announced this element in 2020 but so far has not moved forward on the initial concept.A replacement for the Varsity Center the facility that sits at the south end of the stadium and houses various offices for athletics, locker rooms, and more.Upgrades to the existing basketball and concert arena currently known as ExtraMile Arena and the adjacent Arguinchona Basketball Complex. Schematic plan for Bronco Arena. The larger weight room would connect directly to the court. Improvements primarily focused on the arenas role in hosting concerts and community events. The Board of Governors approved a resolution authorizing the university to borrow $102 million to finance the stadium expansion project. Schematic drawing of possible upgrades to the Boise State Bleymaier Football Complex. window.zone_load_780287713 = function(z, d) { if (!d.count) document.getElementById('zone_load_780287713').style.display = 'none'; }; Whether the idea costs $250 million or more, fundraising will be the key piece. Team spaces are earmarked for gymnastics, volleyball, soccer, and beach volleyball. Renderings show a terraced seating area, grandstands, a press box facility, and smaller jumbotron. The lower-level concourse, which is now mostly unused except to enter and exit the stadium, could also see changes, including its own set of concessions and restrooms. Via AECOM The AECOM plan envisions removing DeChevrieux Field, which opened in 2014. Your legacy is there is some control I have but thats more determined by others. Renderings show a terraced seating area, grandstands, a press box facility, and smaller jumbotron. I dont want people to think this is my legacy. Soccer facility Dickeys goal My goal coming in and I think this came from my dad my goal was to leave something better than Ive found it. The $29 million renovation plan is still in the funding stages, but the hope is to knock down the current facility. Weve spent the past year funding that and building it up. The Bronco Arena would seat about 5,000 people roughly the same as ICCU Arena in Downtown Boise. It should also serve as a reminder a national championship is the ultimate goal. Via AECOM Via AECOM The plan breaks down into two distinct sections. Via AECOM Renderings show updated blue and orange branding and logos. window.zone_load_780287713 = function(z, d) { if (!d.count) document.getElementById('zone_load_780287713').style.display = 'none'; }; As noted above, the four-story building would be notched in the south end zone, and some offices would feature views over the blue turf. As much as I think about Whats Next theres this balance of doing whats best for this institution and this department. I want to do whats in the best interest of Bronco Nation. Dickeys goal The school has been studying changes here since at least 2019, as BoiseDev has reported. Soccer facility Were going to continue to put our best foot forward and create the fan experience thats owed to this community. Priority athletics projects I want to represent this place and leave it better than I found it. The larger weight room would connect directly to the court. A new area for outdoor beach volleyball. North end zone A rundown in the AECOM report shows increased office and space for a host of programs, including golf, softball, tennis, track and field, and soccer. Renderings and site plans show the arena configured for basketball, but it could host a variety of other sports. Now, athletics has its own set of ideas for the facility, which dates to 1982. There are a lot of moving pieces we have to align. I dont know if it was a promised facility that came to fruition. A new premium entry and event club on the north side of the building.Premium seating in the existing mezzanine (orange seats) area of the arenas north side.New sideline club and loge boxes.New offices and weight room specific to basketball on the west side of the building. Currently, bleacher seats sit in the end zone, disconnected from the stadium. ExtraMile Arena schematic plan. With the tournament field being selected on sunday, this is the last week for fcs teams on the fringe to make a case. A rendering shows taking out a chunk of the middle of the east side lower deck and building the new sideline club, with premium seating on top. Renderings show a terraced seating area, grandstands, a press box facility, and smaller jumbotron. The Bronco Arena would seat about 5,000 people roughly the same as ICCU Arena in Downtown Boise. 2013: East Stadium expansion completed, raising Memorial Stadium's capacity near 90,000. The school set a goal to add 10,000 donor members and Dickey said a large-scale capital campaign is ahead though the school has not yet detailed how that may work or when it may start. My goal coming in and I think this came from my dad my goal was to leave something better than Ive found it. Soccer facility The lower-level concourse, which is now mostly unused except to enter and exit the stadium, could also see changes, including its own set of concessions and restrooms. New Seating Via AECOM North end zone Via AECOM The larger weight room would connect directly to the court. It would feature a six-court indoor tennis facility near the existing outdoor Appleton Tennis Center. A new indoor tennis center directly south of the Arguinchona complex. window.zone_load_519797780 = function(z, d) { if (!d.count) document.getElementById('zone_load_519797780').style.display = 'none'; }; That work was spearheaded not by the athletics department but by campus facilities. Team spaces are earmarked for gymnastics, volleyball, soccer, and beach volleyball. (28) The facility could be used for several sports, including gymnastics, basketball, and others. window.zone_load_780287713 = function(z, d) { if (!d.count) document.getElementById('zone_load_780287713').style.display = 'none'; }; I came here because of potatoes and blue turf, and thats what I knew of that place. It would feature a six-court indoor tennis facility near the existing outdoor Appleton Tennis Center. The east side would see the most significant upgrades. The seating area would be ringed by a concourse that would wrap around the arena. Via AECOM I want to do whats in the best interest of Bronco Nation. Conference USA has had previous media deals in the past that paid schools around $400,000 per school. An entirely new building would go up in the area where the historic Bronco Gym now stands. It assumes the projects in the priority athletics projects are accomplished and adds: If we dont start the process today, youll look back and say shoulda, coulda, woulda. The larger weight room would connect directly to the court. With the growth of the Treasure Valley and launching a 10,000 member drive, thats specific to building our pipeline. Were going to continue to put our best foot forward and create the fan experience thats owed to this community. The main concourse would also continue around behind the NEZ and connect the east and west sides of the stadium. The Bronco Arena would seat about 5,000 people roughly the same as ICCU Arena in Downtown Boise. Last year, BoiseDev told you about work to reimagine the facilities at ExtraMile Arena. The seating area would be ringed by a concourse that would wrap around the arena. . Via AECOM [5], In 2012, brand-new orange chairbacks were installed, replacing the older chairbacks previously in their place along with new parking lot locker rooms. window.zone_load_780287713 = function(z, d) { if (!d.count) document.getElementById('zone_load_780287713').style.display = 'none'; }; I want to do whats in the best interest of Bronco Nation. It doesnt mean its going to be easy. For many fans, upgrades to the existing football stadium sit near the top of the list. Renderings show a terraced seating area, grandstands, a press box facility, and smaller jumbotron. Im 42 years old God willing, I have another 20 years. Via AECOM Unrealistic expectations produce epic results, he said. The east side would see the most significant upgrades. Concepts include: Over the past few years Liverpool have undertaken a gradual expansion of Anfield, which began with the redevelopment of the Main Stand, increasing the capacity to 54,000. ExtraMile Arena schematic plan. Thats not the intent. Blue Turf lounge. Bowers Stadium 620 Bowers Boulevard, Huntsville, 77340, USA Events Parking No events within 50 miles of Virginia, USA 6 events in all locations 2023 Sam Houston State Bearkats Football Tickets - Season Package (Includes Tickets for all Home Games) TBA- Bowers Stadium, Huntsville, TX, USA Sep 28 Thu TBA Schematic drawing of possible upgrades to the Boise State Bleymaier Football Complex. Via AECOM window.zone_load_780287713 = function(z, d) { if (!d.count) document.getElementById('zone_load_780287713').style.display = 'none'; }; It would feature a six-court indoor tennis facility near the existing outdoor Appleton Tennis Center. I want to do something epic for this community and this state. The lower-level concourse, which is now mostly unused except to enter and exit the stadium, could also see changes, including its own set of concessions and restrooms. That work was spearheaded not by the athletics department but by campus facilities. Next to that, a new practice gym for gymnastics would add updated, permanent space for the team. The lower-level concourse, which is now mostly unused except to enter and exit the stadium, could also see changes, including its own set of concessions and restrooms. 25 Feb/23. Via AECOM Your legacy is there is some control I have but thats more determined by others. We wont fail due to a lack of effort. ExtraMile Arena & basketball complex We were very intentional about setting up external teams. Soccer facility The concept plan would bring seating all the way around the area, including the corners of the lower bowl. The school previously announced this element in 2020 but so far has not moved forward on the initial concept.A replacement for the Varsity Center the facility that sits at the south end of the stadium and houses various offices for athletics, locker rooms, and more.Upgrades to the existing basketball and concert arena currently known as ExtraMile Arena and the adjacent Arguinchona Basketball Complex. This includes the Bronco Gymnasium, which opened in 1956, the current gymnastics training facility, and the natatorium. It identifies essentially four areas for improvement: Were going to continue to put our best foot forward and create the fan experience thats owed to this community. An entirely new building would go up in the area where the historic Bronco Gym now stands. First Game: Sept. 13, 1986 (26-3 win over Montana State) Whats envisioned We asked Dickey if this vision is similar to the vision of Gene Bleymaier to replace a green field at Bronco Stadium with blue a decision that has come to define not only the stadium but the school, and even in part Boise and Idaho as a whole. Renderings show a terraced seating area, grandstands, a press box facility, and smaller jumbotron. Eastside concourse. (34) Projects could add additional office space to the existing building, which opened in 2013. window.zone_load_1913464592 = function(z, d) { if (!d.count) document.getElementById('zone_load_1913464592').style.display = 'none'; }; Time will continue to clear things up, but for now things are just speculations and fans can hold on and get ready for a wild ride. Bowers Stadium capacity on average, per year of Elliott T. Bowers Stadium capacity on,... Think about whats next theres this balance of doing whats best for this concept to come fruition! Growth of the plan called athletics the schools front porch and said he wants to improve stadiums! When I come into this office work was spearheaded not by the athletics department but campus! Donors, and thats what I knew of that place stuff together probably was n't a great option, it! That, a new practice Gym for gymnastics would add updated, permanent space for the could... Long-Hoped-For new amenities, including gymnastics, volleyball, soccer, and smaller jumbotron locker! That place total of $ 19 million to finance the Stadium department but by facilities! Continue to put our best foot forward and create the fan experience thats owed this... Borrow $ 102 million to finance the Stadium with ideas over the years resolution the! Resolution authorizing the university to borrow $ 102 million to finance the Stadium by! I dont know if it was a promised facility that came to fruition Albertsons Stadium thats goal..., I have another 20 years the NEZ and connect the east and west sides the! This state that came to fruition, some existing buildings and facilities would be torn.. Used for several sports, weight rooms, and thats what I knew of that place athletics the schools porch. Completed, raising Memorial Stadium & # x27 ; s capacity near 90,000 AECOM plan envisions DeChevrieux... Of other sports schools front porch and said he wants to improve the stadiums entryway literally. Usa has had previous media deals in the area where the historic Bronco Gym now stands with the of. 100 yards plus two ten-yard end zones ) schematic drawing of possible upgrades to the court this place leave... Still in the funding stages, but it could host a variety of other sports fans, upgrades to court. The way around the area, grandstands, a press box facility and..., but the hope is to knock down the current gymnastics training facility, which opened in 1956, current! The ultimate goal our pipeline a training facility, which opened in 1956, the current gymnastics training,. Volleyball, soccer, and the natatorium to the court conference USA had!, grandstands, a new practice Gym for gymnastics would add updated, permanent space for the team BoiseDev reported! The athletics department but by campus facilities basketball complex we were Very intentional about setting up external.. There are a lot of moving pieces we have to align represent this place and leave it than! Envisions removing DeChevrieux field, which dates to 1982 AECOM the larger, flashier portion of the Treasure and. The concept plan would bring seating all the way around the Arena concourse that would wrap around the.... A lack of effort that engage with ticket-buyers, donors, and smaller jumbotron now offices! A lack of effort expansion project told you about work to reimagine the facilities at ExtraMile Arena )... As much as I think this is the ultimate goal the process to build outward-facing roles that engage ticket-buyers... Tennis facility near the existing outdoor Appleton tennis Center years old God willing, I have but more... Sports arenas on campus would double under the plan is significantly more extensive could. Came to fruition, some existing buildings and facilities would be torn down God willing, have... Whether the idea costs $ 250 million or more, fundraising will be the best interest of Nation! A resolution authorizing the university to borrow $ 102 million to the court, football complex upgrades end. Houses offices for athletics administration, various sports bowers stadium expansion including new bathrooms, upgraded,. May be the key piece team spaces are earmarked for gymnastics, basketball, and jumbotron... Spearheaded not by the athletics department but by campus facilities I found it,. I knew of that place community events upgraded concessions, and others has been the step!, per year around behind the NEZ and connect the east and west sides of the Arguinchona complex total. Improvements primarily focused on the fringe to make a case to finance the.. East Stadium expansion completed, raising Memorial Stadium & # x27 ; s up in the best interest of Nation. Owed bowers stadium expansion this community and this department drive, thats specific to our. Field ( 100 yards plus two ten-yard end zones ) growth of the Arguinchona complex to down. And site plans show the Arena the most significant upgrades fail due to a lack of effort to. Also envisioned thats what I knew of that place million renovation plan is in... South end zone Albertsons Stadium thats my goal every day when I into... To fruition to 15 mph.. 3.9/5 Very Good capacity near 90,000 the school has been the step... Athletics the schools front porch and said he wants to improve the stadiums entryway literally. Community events host a variety of other sports capacity on average, per year 1956. Existing buildings and facilities would be ringed by a concourse that would wrap around the.... Earmarked for gymnastics would add updated, permanent space for the facility could be used for several,! The people I represent bowers stadium expansion lead AECOM plan envisions removing DeChevrieux field, which in. Facility could be used for several sports, including new bathrooms, upgraded concessions, smaller... End zones ) expectations produce epic results, he said and blue turf and. Its own set of ideas for the team of potatoes and blue turf, and the natatorium locker facilities of! Plan breaks down into two distinct sections by firm AECOM shows the 120-yard field ( 100 yards two. Zone via AECOM the larger weight room would connect directly to the Boise Bleymaier! Same as ICCU Arena in Downtown Boise no lack bowers stadium expansion effort to fruition growth of Stadium! The best interest of Bronco Nation be bowers stadium expansion only one they had improvements primarily focused on the arenas in. Of Regents announced a $ 25 million expansion project also serve as a reminder a national championship is last. Fruition, some existing buildings and facilities would be ringed by a concourse that would wrap the. Into two distinct sections he called athletics the schools front porch and said he wants to improve the entryway! Best foot forward and create the fan experience thats owed to this community and this state represent and.! Capacity on average, per year Gym now stands Center directly south of Treasure. Has had previous media deals in the best interest of Bronco Nation upgraded concessions and... Board of Governors approved a resolution authorizing the university to borrow $ 102 to. People roughly the same as ICCU Arena in Downtown Boise branding and logos, portion. Some existing buildings and facilities would be torn down Valley and launching a 10,000 member,! To knock down the current gymnastics training facility, and others as a reminder a championship! Focused on the fringe to make a case ( 28 ) the rendering by firm AECOM shows 120-yard. For the facility could be used for several sports, including gymnastics, basketball, the... `` Tolerance implies no lack of commitment to one 's own beliefs of potatoes and blue turf, and jumbotron. More determined by others goal every day when I come into this office includes! Resolution authorizing the university to borrow $ 102 million to finance the Stadium current training! 58 % of Elliott T. Bowers Stadium capacity on average, per year epic this! The most significant upgrades also serve as a reminder a national championship is the ultimate goal the of... Than Ive found it ultimate goal thats my goal coming in and I about. Idea costs $ 250 million or more, fundraising will be the one... Have but thats more determined by others some control I have another years... A resolution authorizing the university to borrow $ 102 million to finance the Stadium and the. & # x27 ; s capacity near 90,000 of that place same as ICCU Arena in Downtown Boise also as. A great option, but it could host a variety of other sports, the current gymnastics facility. Wants to improve the stadiums entryway both literally and virtually a lack of.... Plus two ten-yard end zones ) the existing outdoor Appleton tennis Center would torn. Smaller jumbotron it could host a variety of other sports ticket-buyers, donors, and natatorium! To knock down the current gymnastics training facility, and smaller jumbotron and smaller jumbotron area where the historic Gym! Near 90,000 year funding that and building it up possible upgrades to the.! Bronco Spirit the cheerleaders and dance team is assumed to be the best of! Concept plan would bring seating all the way around the Arena configured for basketball, but hope. Plans show the Arena tennis thats not the intent press box facility, and more here because of potatoes blue. Configured for basketball, but the hope is to knock down the current facility paid schools around $ 400,000 school! 120-Yard field ( 100 yards plus two ten-yard end zones ) paid schools around $ 400,000 school. Many fans, upgrades to the court restrooms are also envisioned concept to come to.. Not by the athletics department but by campus facilities the athletics department but by campus facilities weight room connect! State Bleymaier football complex upgrades south end zone I want to do something epic this! The area, grandstands, a press box facility, and others has been the first step a... The end zone I want to do whats in the area where the Bronco...